Sinopec Qilu Petrochemical CCS

Sinopec Qilu Petrochemical CCS plans to retrofit a CO2 capture system to an existing coal/coke water slurry gasification unit at a fertiliser plant in Zibo City, Shangdong Province, China. The initial phase of the facility is in construction with a capture unit capable of close to 0.4 Mpta CO2 to be operational in 2019. The CO2 stream would be transported by pipeline to the Shengli oilfield for enhanced oil recovery.

Project data is current as at 01/06/2018